J.M. Baxi & Co. handled Project of Windmill cargo at Tuticorin port

July 26 2022, 1:51 pm
MV Happy River at Tuticorin Port

J.M. Baxi & Co. handled the vessel MV Happy River which arrived and berthed at TUTICORIN Port  on 14/07/2022 to load  27 nos. of Windmill blades and 27  Tip blades  along with 141 number of spacers.  The loading had to be performed engaging two numbers of Harbour Mobile Cranes to operate in tandem and required extensive coordination between the HMC operators and the vessel. Subsequent to the loading the lashing and securing was carried out to the entire satisfaction of the Master, the entire operation was completed within 9 shifts and the services extended by JMB were acknowledged and appreciated by our Principals. JMB takes pride in the safety culture the company has always adhered to, which assists the team to execute every operation as per the safe shipping